Potting Process Checklist
MWF Schedule - Warehouse
The storage room has temperature of between 22°C to 25°C
The storage room has relative humidity of between 30% to 40%
Confirm chemical Spill Tray
Confirm materials is sitting on the shelves or pallet
nan
Confirm spill Kit Cabinet Present
Opening of new container - Production
Confirm wearing of Proper PPE(e.g. face mask, head cover, safety goggles)
Confirm perform homogenization or pre-mixing of Resin
Extract small sample of Hardener confirm it is not cloudy and no crystallization
Confirm that the batch inside the feeder and the fresh material are of the same expiry date
Opening of new container - Quality
After homogenization, Density is within +/-0.01g/cm3 using CoA as reference
Start of the Shift - Maintenance
Dessicant are still in good condition and the color has not changed
Confirm machine for any visible damage, leaks, or loose parts.
Confirm power supply is stable, emergency stops are working, and all safety guards are in place.
Correct recipe/program is selected for the loaded material.
Work area is clean, tools are organized, and waste bins are emptied.
Confirm mixing chamber and nozzles are clean, and correct static mixer is used
Start of the Shift - Production
Confirm machine recipe matches loaded material
The potting room/area has temperature of between 22°C to 25°C
The storage room/area has relative humidity of between 30% to 40%
Confirm sort: Remove unnecessary tools, materials, or waste from the work area.
Confirm set in Order: Arrange necessary items neatly and label if needed.
Confirm shine: Wipe down machines, tools, and floor surfaces-- keep everything clean.
Standardize: Confirm correct locations for materials, tools, and documents are maintained.
Sustain: Do a quick final confirmation if the area still organized and ready for the next operation?
Confirm if the Feeder Mixer is rotating as per set up.
Confirm the actual temperature of the Resin Feeder as per requirements
Start of the Shift - Quality
Confirm material in feeder is not expired
Calculate the absolute humidity and confirm less than 10g/m3
Start of the Shift - Quality/ Engineer/ Production
Confirm that the equipment is delivering the correct mixing ratio (5 readings; collect the data)
Prepare and cure cup sample, then confirm and record hardness
Upon Arrival of Goods - Receiving/ Incoming Quality
Confirm product name, batch numbers, quantities, and packaging type against the invoice/delivery documents.
Confirm packing List
Confirm safety Data Sheets (SDS, especially important for chemicals)
Confirm certificate of Analysis (CoA) if applicable (some products or lots might require it)
Confirm the condition of the truck/container (sealed, clean, dry, no odor of spillage).
No signs of leakage, dents, damage, punctures, swelling, etc.
Pallets properly wrapped, not broken.
Labels are intact and readable:
Remaining shelf life is acceptable
Goods are transferred immediately to proper storage room and conditions
The storage room has temperature of between 22°C to 25°C
The storage room has relative humidity of between 30% to 40%
Confirm goods are not exposed to direct sunlight or windows
0 of 44 items completed